EV charging switchboard design and installation considerations | Eaton PSEC
9:23
Learn about the practical aspects of installing EV chargers as Eaton’s Power Systems Experience Center (PSEC) team installs twelve level 2 EV chargers and how Eaton’s EV charging infrastructure (EVCI) alleviates some of the complexity. Erik Hurd, PSEC Senior Engineer, starts off by presenting the PSEC as a case study in installing EV chargers in a parking lot. The team wanted level 2 AC chargers which are common in both commercial and residential applications. Follow along to see some of the challenges the team faced due to existing conduit and cable. As part of the design phase, the PSEC team narrowed it down to three systems which all included a range of Eaton EVCI solutions, such as: • Eaton’s EV smart breaker charger • EV charging panelboard • EV charging switchboard • Integrated Facility Systems (IFS) switchboard • Direct connect kit • Junction box kit In the end, the PSEC team chose an integrated system that also allows for future proofing with the ability to add DC fast charging later. The chosen design is also a compact, integrated system that includes security and cable management to ensure safety and prevent damage. To see Eaton’s EV charging infrastructure (EVCI) solutions, visit: https://www.eaton.com/EVCI Thank you for watching one of our many educational videos on the topic of power systems. Schedule a visit to one of Eaton's Power Systems Experience Centers in either Pittsburgh or Houston to learn more! To learn more about Eaton products and our Power Systems Experience Centers: https://eaton.com/experience To view more educational videos from Eaton's Power Systems Experience Centers: https://videos.eaton.com/experience Chapters 00:00 00:42 Intro 01:44 Project scope 02:42 EV smart breaker charger 04:06 PSEC EV design options 05:25 PSEC EV design 06:44 EV charging connection and security 07:34 Additional EV charging options #evcharging #energytransition #powersystem #engineering #eatonexperience #experiencecenter #electricalengineering #electricaltrainingvideos #powersystemdesign
Learn about the practical aspects of installing EV chargers as Eaton’s Power Systems Experience Center (PSEC) team installs twelve level 2 EV chargers and how Eaton’s EV charging infrastructure (EVCI) alleviates some of the complexity. Erik Hurd, PSEC Senior Engineer, starts off by presenting the PSEC as a case study in installing EV chargers in a parking lot. The team wanted level 2 AC chargers which are common in both commercial and residential applications. Follow along to see some of the challenges the team faced due to existing conduit and cable. As part of the design phase, the PSEC team narrowed it down to three systems which all included a range of Eaton EVCI solutions, such as: • Eaton’s EV smart breaker charger • EV charging panelboard • EV charging switchboard • Integrated Facility Systems (IFS) switchboard • Direct connect kit • Junction box kit In the end, the PSEC team chose an integrated system that also allows for future proofing with the ability to add DC fast charging later. The chosen design is also a compact, integrated system that includes security and cable management to ensure safety and prevent damage. To see Eaton’s EV charging infrastructure (EVCI) solutions, visit: https://www.eaton.com/EVCI Thank you for watching one of our many educational videos on the topic of power systems. Schedule a visit to one of Eaton's Power Systems Experience Centers in either Pittsburgh or Houston to learn more! To learn more about Eaton products and our Power Systems Experience Centers: https://eaton.com/experience To view more educational videos from Eaton's Power Systems Experience Centers: https://videos.eaton.com/experience Chapters 00:00 00:42 Intro 01:44 Project scope 02:42 EV smart breaker charger 04:06 PSEC EV design options 05:25 PSEC EV design 06:44 EV charging connection and security 07:34 Additional EV charging options #evcharging #energytransition #powersystem #engineering #eatonexperience #experiencecenter #electricalengineering #electricaltrainingvideos #powersystemdesign
Electrical distribution Similar Videos
-
Eaton transformer testing facilities | Eaton PSEC
6:13
Eaton’s Power System Experience Center began as a transformer test lab. Today, Eaton has a leading transformer test lab and manufacturing facility in Juarez. Learn about harmonic effects as we discuss the Juarez test lab capabilities.
-
Reduced voltage soft starters (RVSS) explained | Eaton PSEC
8:51
A reduced voltage soft starter, or RVSS, is an electronic device used to start and control the speed of electric motors. RVSSs are designed to protect motors from sudden influxes in power by limiting inrush current associated with motor startup.
-
Utility overvoltage protection with surge arresters | Eaton PSEC
9:06
Learn how surge arresters protect utility distribution equipment from overvoltage’s, caused primarily by lightning. Also, discover how arresters work, sizing considerations, and their role in maintaining the reliability of utility infrastructure.